精品国产高清一区二区三区av_日韩精品午夜视频一区二区_国产蜜月在线观看_a√天堂中文字幕在线_少妇免费久久三级_高清精品亚洲一区_人人视频在线观看_年熟女大胆露脸啪啪对白p_中文字幕午夜福利片午夜福利片_亚洲A∨日韩AⅤ无码电影

Home | Add to Favorites | 中文

Contact

Shanghai Hong Sheng Electrical and Mechanical Technology Co., Ltd
Tel: 021-56010802

TEI:(86-21-56010802

13916652780,17756586872


E-mail : sgesm@126.com

MSN :czsstar@126.com

Skype :ChampionChina

Company News

Your current location:Home > Company News
Operational Guidelines for Water Deficiency Protectors of High Shear Emulsification Pumps
Time:2018/12/3 17:37:01 Read:1003

The main function of the water shortage protector of emulsified pump is to ensure that the mechanical seal will not be burned out when the cooling device of the mechanical seal fails during the operation of the emulsified pump. It is a protective device of the mechanical seal.
1. Water-shortage protector water pipe connection diagram is as follows:

2. Pre-boot operation sequence
A. Open the tap water flow at the inlet end (no impurity pollution. Ensure the inlet water pressure P > 0.2Mpa), and the ball valve is fully opened to ensure the smooth flow at the outlet end of the pipe. P_P_P_P
B. In the case of checking the axle and stator of emulsifier without rubbing and jamming (manual disk rotation checking), open the power switch in the water-shortage protector, adjust the opening degree of the ball valve to make the inlet and outlet water pressure P-P1 (> 1kg), ensure that the outlet has water outflow, and smooth for a long time. The emulsifier starts to work normally.
C. It is strictly forbidden to use impurity sewage at the import end to enter the water shortage protector, and to open the emulsifier system when the water at the import end and the outlet end is not smooth.

Print || Close
Links:   實(shí)驗(yàn)室乳化機(jī) |   | 
Shanghai Hong Sheng Electrical and Mechanical Technology Co., Ltd. 2016 All rights
Powered by:www.chuge8.com